headerdrawing1.jpg (96365 bytes)

Sulphuric Acid on the WebTM Technical Manual DKL Engineering, Inc.

Knowledge for the Sulphuric Acid Industry Line.jpg (1139 bytes)

Sulphuric Acid on the Web

Introduction
General
Equipment Suppliers
Contractor

Instrumentation
Industry News
Maintenance
Acid Traders
Organizations
Fabricators
Conferences

Used Plants
Intellectual Propoerty
Acid Plant Database
Market Information
Library

Technical Manual

Introduction
General

Definitions
Instrumentation
Plant Safety
Metallurgial Processes
Metallurgical
Sulphur Burning
Acid Regeneration
Lead Chamber
Technology
Gas Cleaning
Contact
Strong Acid
Acid Storage
Loading/Unloading

Transportation
Sulphur Systems
Liquid SO2
Boiler Feed Water
Steam Systems

Cooling Water
Effluent Treatment
Utilities
Construction
Maintenance
Inspection
Analytical Procedures
Materials of Construction
Corrosion
Properties
Vendor Data

DKL Engineering, Inc.

Handbook of Sulphuric Acid Manufacturing
Order Form
Preface
Contents
Feedback

Sulphuric Acid Decolourization
Order Form
Preface
Table of Contents

Process Engineering Data Sheets - PEDS
Order Form
Table of Contents

Introduction

Bibliography of Sulphuric Acid Technology
Order Form

Preface
Contents

Sulphuric Acid Plant Specifications
 

Google Search new2.gif (111 bytes)

 

 

Acid Plant Database  May 17, 2016

Owner Eti Bakir A.S.

Eti-Bakir-Logo.jpg (13237 bytes)
Cengiz-Holding-Logo.JPG (5146 bytes)

Location Samsun
Turkey
Background 1968 - Karadeniz Bakir Isletmesi A.S. (KBI)
2004 – Company privatized and name changed to Eti Bakir A.S. Part of Cengiz Holding www.cengiz.com.tr
Website www.etibakir.com.tr
Plant

Samsun Smelter

Plant No. 1 Plant No. 2
Coordinates* 41° 14' 36" N, 36° 27' 38" E   41° 14' 36" N, 36° 27' 36.5" E  
Type of Plant Metallurgical Metallurgical
Gas Source Copper Copper
Plant Capacity 220,000 STPA
SA/DA - -
Status - -
Year Built - -
Technology - -
Contractor - -
Remarks - -
Pictures

Eti Bakir - Samsun 1.jpg (111231 bytes)  Eti Bakir - Samsun 3.jpg (151584 bytes)

General Purchase by Cengiz Holding via privatization project, the company deals with copper mining at Kastamonu Kure and Artvin Murgul facilities and operates the copper smelting factories at Samsun plants.

Production of Copper and Pyrite Concentrate at Eti Copper Kastamonu Küre facilities are realized with an annual capacity of 1.000.000 tons touvenant ore, 90.000 tons Copper Concentrate and 400.000 tons Pyrite Concentrate and The Murgul plant extracts raw copper ore over 2.700.000 tons per year through 3 open mines, and processes to produce 75.000 tons of copper concentrate per year for supply of Concentrate Copper to Samsun Smelting Facilities.

The Kure Mines and Samsun Smelter plants launched in 1973 for the purpose of processing the copper ore deposits at the Black Sea region, joined into Cengiz Holding’s structure in 2004, the Murgul facilities joined into Cengiz Holding’s structure in 2006.

Today, Samsun Smelter factory is the sole facility that produces copper from ore. Samsun Facilities consist of Smelting, Sulfuric Acid and Concentrator Factories. In addition, a Hydroelectric Power Plant at an installed capacity of 2x2.35 MW at Murgul Mining Facility, has been going on to generate power in frame of Production License.

​​​​​
Samsun Copper facilities were established in the district of Tekkekoy, located in east Samsun, in order to produce blister copper by using the ore deposits in the Black Sea Region. The Samsun Smelter was commissioned on 23 January 1973 when the furnace was fired up, followed by the commissioning of our sulphuric acid production facilities in 1975.​

Plants which were taken over in 2004 under privatisation continue their operation within Cengiz Holding under the commercial title of Eti Bakir Co. As the only factory of Turkey where copper is produced from ore, Eti Bakir  Samsun Plant continuously invests in new facilities and technology to adapt itself to the technological developments of the day and be competitive in international markets. As such, the plant makes a significant contribution to our Turkey’s, and particularly Samsun’s, economy. Furthermore, as an environment sensitive company Eti Bakir Co. invests in waste treatment and recovery facilities equipped with state-of-the-art technology. 

The feasibility work on the copper electrolysis was started in the second half of 2008 and the plant was finally commissioned in early 2011 along with the copper anode production. Around the same time, the comprehensive modernisation and maintenance work on the smelter was completed and the anode casting machine with 180 tons/charge capacity was included in the facility. As a result of refining the anode containing 99-99.5% copper at the smelter, we achieve 99.9999% pure electrolytic copper cathodes. 

Our electrolysis facility which is set up in an indoor area of about 10,000m2 and which has 440 production cells produces 75,000 tons of copper cathodes per year and it is the biggest and most modern electrolysis facility in Turkey. The copper cathodes produced here have LME A Grade specifications. 

Production equipment can be controlled and checked from a control centre by monitoring and recording the parameters of the electrolysis process. Therefore, quality of the produced copper cathodes is always kept at a level to our customers’ satisfaction. 

 

Eti Bakir Co. produces 42,000 mt electrolytic copper and 200,000 mt sulphuric acids per year. Furthermore, our recently completed Amonium Sulphate Fertilizer will be producing 300,000 mt Amonium sulphate fertilizer when it is commissioned. 

 

Our laboratory is capable of making the quality control of all kinds of raw materials and products with high precision. Particularly, our lab’s copper analyses capability can easily compete with any international referee labs. Our lab is also accredited for water analyses and it continues to deliver a variety of services with its renewed outlook, new technology devices and highly efficient expertise. 

References -
News December 27, 2013 - Outotec will deliver technology and services worth more than €100m to Cengiz Group for its Mazidagi and Samsun operations in Turkey.  The orders include a roasting plant for pyrite concentrates, calcine leaching and solvent extraction plants, copper smelter modernization, as well as gas cleaning and sulfuric acid plants.  The orders will be booked in Outotec's 2013 fourth quarter order intake.

MTPD - Metric Tonne per Day           STPD - Short Ton per Day
MTPA - Metric Tonne per Annum      STPA - Short Ton per Annum
SA - Single Absorption
DA - Double Absorption
 

* Coordinates can be used to locate plant on Google Earth